Industrial Automation


1.     The electromagnetic relays are constructed with _______

  • A.    Electrical components
  • B.    Mechanical components
  • C.    Electromechanical components
  • D.    None of the above

 

2.     In PLC the user can write the programs with the help of ________

A.       Optical isolation

B.    Sensing devices

C.    Programming devices

D.    None of the above

 

3.     A system that regulates or commands itself

A.    Open-loop

B.    Closed-loop

C.    Both open-loop and closed-loop

D.    Control system

 

4.     In which control system feedback is available?

A.    Open-loop

B.    Close-loop

C.    Both Open-loop and Close-loop

D.    None of the above

 

5.     Why programmable logic controllers are required?

A.    It reduces the efforts of human begins

B.    To get the maximum efficiency

C.    To reduce the complex circuitry of entire system

D.    All of the above

 

6.     Which mode accepts and converts signals from sensors into a logic signal?

A.    Input module 

B.    Output modular

C.    Both Input and Output modules

D.    None of the above

 

7.     The programmable logic controller works on __________

A.    Parallel mechanism

B.    Sequential mechanism

C.    Both Mixed mechanism

D.    None of the above

 

8.     _________ provides the voltage to PLC primary components

A.    Control valve

B.    Level transmitter

C.    Flow transmitter

D.    Power supply Unit

 

9.     The CPU consists of _________

A.    Arithmetic Logic Unit

B.    Internal memory of CPU

C.    Internal timers, counters, flags

D.    All of the above

 

10. What are the components that make the programmable logic controller work?

A.     Power supply

B.     CPU

C.    Input and Output module

D.    All of the above

 

11. For ON delay timer, which programming bit will be ON after the timer finishes timing?

A.    Timing bit

B.    Enable bit

C.    Done bit

D.    All

 

12. For ON delay timer, which programming bit will be ON when input is ON and stays on until the timer finishes timing?

A.    Timing bit

B.    Enable bit

C.    Done bit

D.    All

 

13. For OFF delay timer, which programming bit will be ON if the input is ON and OFF if the input is OFF.

A.    Timing bit

B.    Enable bit

C.    Done bit

D.    All

 

14. For ON delay timer, which programming bit will be ON if the input is ON and OFF if the input is OFF.

A.    Timing bit

B.    Enable bit

C.    Done bit

D.    All

 

15. Which one of the following is not a continuous type controller?

A.    PID controller

B.    PD controller

C.    PLC

D.    None

 

16. What do we mean by designing a PID controller?

A.    Purchasing PID hardware component

B.    Calculating gain values

C.    Preparing ladder logic diagram

D.    None

 

17. Which gain decides how much correction has to be done on a given system when error happens?

A.    Proportional gain

B.    Integral gain

C.    Derivative gain

D.    All

 

18. Which gain decides how long the correction has to be done on a given system when error happens?

A.    Proportional gain

B.    Integral gain

C.    Derivative gain

D.    All

 

19. Which gain decides how fast the correction has to be done on a given system when error happens?

A.    Proportional gain

B.    Integral gain

C.    Derivative gain

D.    All

20. For a given closed loop continuous control system, is it mandatory to use all the three modes (PID) ?

A.    Yes, it is mandatory

B.    No, some systems may not need all the three modes

C.    No, always use only one mode controller

D.    None